Permit Board - DC - Blox ATL West 1B

Last Updated 5/16/2026 2:11:21 AM

Type
Employer
Location
Start
End
Status
PER-152581
LOTO Permit V1.0 (Jose Template) DO NOT DELETE . ATL-West Site Specific
Evans General Contractors LLC
Matt Plum
MV-Lock Circut #4 / West of 80MW
11:46 AM
12/26/2025
11:46 AM
11/27/2026
Scheduled 140 days ago
PER-152588
LOTO Permit V1.0 (Jose Template) DO NOT DELETE . ATL-West Site Specific
Evans General Contractors LLC
Matt Plum
F13 (40MW Exterior Work) / MV Utility Metering cabinet #2
MV-Lock Circut #2 / MV Utility Metering cabinet #2
11:56 AM
12/26/2025
11:56 AM
11/27/2026
Scheduled 140 days ago
PER-152594
LOTO Permit V1.0 (Jose Template) DO NOT DELETE . ATL-West Site Specific
Evans General Contractors LLC
Matt Plum
MV-Lock Circut #5 / West of 80 MW
12:28 PM
12/26/2025
12:28 PM
11/27/2026
Scheduled 140 days ago
PER-152577
LOTO Permit V1.0 (Jose Template) DO NOT DELETE . ATL-West Site Specific
Evans General Contractors LLC
Matt Plum
MV-Lock Circut #3 / West side of 80MW.
11:43 AM
12/26/2025
11:44 AM
11/28/2026
Scheduled 140 days ago
PER-152587
LOTO Permit V1.0 (Jose Template) DO NOT DELETE . ATL-West Site Specific
Evans General Contractors LLC
Matt Plum
MV-Lock Circut #1 / Greystone MV Utility Metering cabinet #1
11:52 AM
12/26/2025
11:52 AM
12/26/2026
Scheduled 140 days ago
Hot Work Permit
Brasington Bailey Construction
Moises Alvarez
B1 (Site Map) / Data Hall 1st floor / gallery 1-2 North and south 2nd floor
A1 (Site Map) / Data Hall 1st floor / gallery 1-2 North and south 2nd floor
6:44 AM
5/15/2026
2:00 PM
5/15/2026
Completed 9 hours ago
Hot Work Permit
Mann Mechanical
Adam Pina
+ 16 other supervisors
B1.2 (40MW Level 1) / Northeast/southeast
B1.1 (40MW Level 1) / Northeast/southeast
7:00 AM
5/15/2026
4:00 PM
5/15/2026
Completed 9 hours ago
Hot Work Permit
Mann Mechanical
Adam Pina
+ 16 other supervisors
Critical Power Room A (LV2) / Level 2 critical power rooms
Critical Power Room G (LV2) / Level 2 critical power rooms
+ 11 other zones
7:00 AM
5/15/2026
4:00 PM
5/15/2026
Completed 9 hours ago
Hot Work Permit
Mann Mechanical
Adam Pina
+ 16 other supervisors
SEQ. B 9-11 / Roof
SEQ. C L11-13 / Roof
+ 1 other zones
7:00 AM
5/15/2026
4:00 PM
5/15/2026
Completed 9 hours ago
Hot Work Permit
Mann Mechanical
Adam Pina
+ 16 other supervisors
SEQ. B 9-11 / Roof
7:00 AM
5/15/2026
4:00 PM
5/15/2026
Completed 9 hours ago
Hot Work Permit
Mann Mechanical
Adam Pina
+ 16 other supervisors
H20 (40MW Interior Level 1) / 2nd Floor North Hallway
JAN 2-246 / 2nd Floor North Hallway
+ 1 other zones
8:52 AM
5/15/2026
4:00 PM
5/15/2026
Completed 9 hours ago